- This event has passed.
In-Situ Chemical Oxidation (ISCO) Workshop
March 15, 2011 @ 9:00 am - 4:00 pm
Agenda
9:15 Welcome and Logistics – Jennifer Griffith, NEWMOA
9:30 ISCO Overview [PDF] – Doug Larson, Geosyntec
- Chemistry
- Applicable Contaminants and Site Conditions
- Oxidant Selection
- Remediation Timeframes
- Safety Considerations (including Homeland Security requirements)
10:15 Site Characterization and Data Needs [PDF] – Ian Osgerby, US Army Corps of Engineers
- Contaminants
- Hydrogeology
- How ISCO might affect Ongoing Anaerobic Processes
- Mobilization of Hexavalent Chromium
11:00 Break
11:15 Treatability Testing [PDF] – Gerald Cresap, Groundwater & Environmental Services (GES)
- Bench-Scale Testing
- Interpreting the Results
- Designing a Pilot Study Using Bench-Scale Data
- Case Study and Examples
12:00 Lunch – Provided
12:45 System Design [PDF] – Mike Marley and/or Brant Smith, XDD
- Scaling up from Bench Scale to Pilot Scale to Full Scale
- Delivery and Contact
- Cost Issues
1:30 Implementation and System Operation [PDF] – Tim Andrews, Nobis Engineering and Ed Hathaway, US EPA Region 1
- Monitoring
- Troubleshooting and Lessons Learned
- Rebound – Anticipating, Planning For, Determining, Reacting To
2:15 Case Study
- Autopsy of a Small UST Site in Bedrock: Implications for ISCO Remediation – Bill Brandon, US EPA Region 1
2:45 Break
3:00 Monitoring of ISCO Treatment with Time-Series Geophysical Surveys [PDF] – Philip Harte, US Geological Survey
- Borehole Electromagnetic and Surface DC Resistivity
- Case Study Assessment of ISCO Effectiveness in Recalcitrant Zones
3:30 Case Study
- Dry Cleaner Site in Vermont [PDF] – Richard Spiese, VT DEC
4:00 Adjourn